길어지니까 요약글.
▼ 일단 CPU-Z 먼저. ▼
더보기

Snapdragon 820 SoC

F8332 / msm8996 / 5.2 inches / 1080 x 1920 / 423dpi / 146x72x8.1 cm / 161g / 3G RAM / Internal 50.41GB (64GB Model)

Android 8.0.0 / API Level 26 / Java VM ART 2.1.0 / OpenGL ES 3.2 / armv8l / 3.18.66-perf-g752ca6b518bc(1629307573)

Li-ion / 3915mV / 2900mAH



BMI160 Accelerometer,Gyroscope / AK09915 Magnetometer / APDS-9940 Proximity,Light Sensor / HSPPAD042A Pressure

Graviry / Linear Acceleration / Rotation / Step Detector / Step Counter / Significant Motion Detector / Game Rotation / GeoMagnetic Rotation / Orientation / Tilt Detector

AMD랑 RMD는 뭘까요. Basic Gestures / Facing / Pedometer / Motion Accel / Coarse Motion Classifier / Pressure with additional info / fingerprint key sensor

CPU-Z for Andrioid version 1.28










▲ F8332 CPU-Z ▲
▼ 이하 AndroSensor ▼
▲ F8332 AndroSensor ▲
▼ 이하 GeekBench 4 ▼
▲ F8332 GeekBench 4 ▲
'* Talk * > 》Within Picture' 카테고리의 다른 글
| F8332, X3s, YP-GB1, GT-S5570, GT-P1000 카메라 비교 비슷한 뻘짓 (0) | 2020.07.17 |
|---|---|
| GT-S5570 갤럭시 미니로 찍은 사진들 (0) | 2020.07.17 |
| 2018 10 2X 엑스페리아 Z2 사망, 그리고 (0) | 2020.07.17 |
| 갤럭시 미니, 갤럭시 플레이어, 어메이징 X3s CPU-Z (0) | 2020.07.17 |
| 2018 08 11 Xperia Z2 (0) | 2020.07.17 |














